Septic system
We’re back! A whole month passed and the concrete slab has finally cured.
Last weekend (April 1st), they started to dig and install the pipes for the septic system but the only thing missing is the concrete tank.
Psst, I’m working on the photos/videos of this crazy week of framing, all I can say is the Nest is finally out of ground!